DocumentCode
676564
Title
Feasibility study of district heating with CHP, thermal store and Heat Pump
Author
Zongxiang Wu ; Jianzhong Wu
Author_Institution
Control& Power Group, Imperial Coll. London, London, UK
fYear
2013
fDate
9-11 Sept. 2013
Firstpage
1
Lastpage
4
Abstract
Integration of Combined Heat and Power (CHP) plant, Heat Pump (HP), Thermal Storage (TS) and auxiliary boiler into a district heating scheme is able to provide an efficient way of using energy. This paper analyses the feasibility of such a scheme in Ebby Vale using the EnergyPro tool under existing energy market and policies. In the scenario based simulation, a 40279.7 MWh worth of heat was sent. The results show that the CHP+TS system present more encouraging environmental performance and acceptable profit margin, whilst the economic potential can be enhanced further with the addition of a HP unit. A sensitivity analysis was conducted to show to which extent economic assumptions will vary the result.
Keywords
boilers; cogeneration; district heating; heat pumps; power markets; thermal energy storage; CHP plant; EnergyPro tool; TS system; auxiliary boiler; combined heat and power plant; district heating; economic potential; energy market; energy policies; heat pump; profit margin; sensitivity analysis; thermal storage; Combined Heat and Power (CHP); District heating; Feasibility study; Heat pump; Thermal storage;
fLanguage
English
Publisher
iet
Conference_Titel
Renewable Power Generation Conference (RPG 2013), 2nd IET
Conference_Location
Beijing
Electronic_ISBN
978-1-84919-758-8
Type
conf
DOI
10.1049/cp.2013.1775
Filename
6718685
Link To Document