• DocumentCode
    681361
  • Title

    Management of railway earthworks for adverse weather: Operational risk management as part of the wider asset management approach

  • Author

    Wilcock, Tony ; Niewiarowski, Marek ; Mian, Juliet

  • Author_Institution
    Geotech. Programme, Network Rail, Milton Keynes, UK
  • fYear
    2013
  • fDate
    27-28 Nov. 2013
  • Firstpage
    1
  • Lastpage
    23
  • Abstract
    Network Rail aims to manage its assets sustainably, for the lowest whole-life, whole-system cost . This is achieved through asset examination, geotechnical evaluation (of asset integrity), maintenance, refurbishment and renewal, monitoring & alarms, mitigation measures including special inspections, speed restrictions . Monitoring asset performance - safety and reliability leading to continuous improvement is presented.
  • Keywords
    asset management; condition monitoring; continuous improvement; geotechnical engineering; geotechnical structures; inspection; railway safety; railways; reliability; risk management; structural engineering; asset integrity; asset management; conditioning; continuous improvement; geotechnical evaluation; inspections; maintenance; network rails; operational risk management; performance monitoring; railway earthworks management; refurbishment; reliability; renewal; safety;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    IAM Asset Management Conference 2013, IET
  • Conference_Location
    London
  • Electronic_ISBN
    978-1-84919-799-1
  • Type

    conf

  • DOI
    10.1049/cp.2013.1931
  • Filename
    6737974