• DocumentCode
    715115
  • Title

    Experiences with dynamic PMU compliance testing using standard relay testing equipment

  • Author

    Kilter, Jako ; Palu, Ivo ; Almas, Muhammad Shoaib ; VANFRETTI, LUIGI

  • Author_Institution
    Dept. of Electr. Power Eng., Tallinn Univ. of Technol., Tallinn, Estonia
  • fYear
    2015
  • fDate
    18-20 Feb. 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper presents the results of dynamic compliance testing of phasor measurement units (PMUs) from three different vendors in a laboratory environment. Testing is performed by providing three phase voltage and current injections to the VT and CT inputs of the PMUs through Freja-300 stand-alone protection relay test set. Testing is performed according to the standard “IEEE C37.242-2013 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control”. The paper discusses the test setup, testing process, calculation of performance evaluation parameters and overall test results of this project.
  • Keywords
    conformance testing; phasor measurement; power system reliability; relay protection; Freja-300 stand-alone protection relay test set; IEEE C37.242-2013; dynamic PMU compliance testing; laboratory environment; performance evaluation parameter calculation; phasor measurement units; power system application reliability; standard relay testing equipment; testing process; three phase current injection; three phase voltage injection; Delays; Iron; Phasor measurement units; Testing; Time factors; Time-frequency analysis; PMU calibration testing; Phasor Measurement Units; stand-alone testing; synchrophasors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies Conference (ISGT), 2015 IEEE Power & Energy Society
  • Conference_Location
    Washington, DC
  • Type

    conf

  • DOI
    10.1109/ISGT.2015.7131833
  • Filename
    7131833