• DocumentCode
    736005
  • Title

    Modified block replacement with used items at scheduled periods and at failures

  • Author

    Rebaiaia, Mohamed-Larbi ; Ait-kadi, Daoud ; Rahimi, Samira Abbasgholizadeh ; Jamshidi, Afshin

  • Author_Institution
    Interuniv. Res. Center on Enterprise Networks, Logistics & Transp., Laval Univ., Quebec City, QC, Canada
  • fYear
    2015
  • fDate
    25-27 May 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In maintenance engineering, it is intended that in a Block Replacement Policy (BRP) model, items are removed and replaced by new ones at failure and at the beginning of each scheduled time kT (fe = 1, 2, ...). It was proved that this kind of strategies has its limits and didn´t cover others particular situations. This paper addresses a modified BRP model, that in the same conditions, instead of using new items, used items are provided. The idea behind this model is to minimize the expected total cost while to reduce the impact of the removed items on the environment.
  • Keywords
    failure analysis; maintenance engineering; optimisation; reliability theory; scheduling; BRP model; block replacement policy; failure analysis; maintenance engineering; optimization; period scheduling; used item; Approximation methods; Density functional theory; Graphics; Maintenance engineering; Mathematical model; Reliability; Weibull distribution; Block replacement policy; Maintenance; Optimization; Sustainability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control, Engineering & Information Technology (CEIT), 2015 3rd International Conference on
  • Conference_Location
    Tlemcen
  • Type

    conf

  • DOI
    10.1109/CEIT.2015.7233173
  • Filename
    7233173