DocumentCode
736005
Title
Modified block replacement with used items at scheduled periods and at failures
Author
Rebaiaia, Mohamed-Larbi ; Ait-kadi, Daoud ; Rahimi, Samira Abbasgholizadeh ; Jamshidi, Afshin
Author_Institution
Interuniv. Res. Center on Enterprise Networks, Logistics & Transp., Laval Univ., Quebec City, QC, Canada
fYear
2015
fDate
25-27 May 2015
Firstpage
1
Lastpage
5
Abstract
In maintenance engineering, it is intended that in a Block Replacement Policy (BRP) model, items are removed and replaced by new ones at failure and at the beginning of each scheduled time kT (fe = 1, 2, ...). It was proved that this kind of strategies has its limits and didn´t cover others particular situations. This paper addresses a modified BRP model, that in the same conditions, instead of using new items, used items are provided. The idea behind this model is to minimize the expected total cost while to reduce the impact of the removed items on the environment.
Keywords
failure analysis; maintenance engineering; optimisation; reliability theory; scheduling; BRP model; block replacement policy; failure analysis; maintenance engineering; optimization; period scheduling; used item; Approximation methods; Density functional theory; Graphics; Maintenance engineering; Mathematical model; Reliability; Weibull distribution; Block replacement policy; Maintenance; Optimization; Sustainability;
fLanguage
English
Publisher
ieee
Conference_Titel
Control, Engineering & Information Technology (CEIT), 2015 3rd International Conference on
Conference_Location
Tlemcen
Type
conf
DOI
10.1109/CEIT.2015.7233173
Filename
7233173
Link To Document