• DocumentCode
    747121
  • Title

    Scheduling high-grade steelmaking

  • Author

    Dorn, Jürgen ; Shams, Reza

  • Author_Institution
    Christian Doppler Lab. for Expert Syst., Vienna Univ. of Technol., Austria
  • Volume
    11
  • Issue
    1
  • fYear
    1996
  • fDate
    2/1/1996 12:00:00 AM
  • Firstpage
    28
  • Lastpage
    35
  • Abstract
    This expert system for scheduling high-grade steel production cuts engineering planning time, allows for greater what-if experimentation, and improves quality control. The complexity of production-cycle scheduling problems had defeated earlier, purely conventional software approaches
  • Keywords
    expert systems; production control; steel industry; steel manufacture; engineering planning time; high-grade steel production; high-grade steelmaking scheduling; production-cycle scheduling problems; quality control; Alloying; Capacity planning; Casting; Constraint theory; Control systems; Job shop scheduling; Production; Slabs; Steel; Strain control;
  • fLanguage
    English
  • Journal_Title
    IEEE Expert
  • Publisher
    ieee
  • ISSN
    0885-9000
  • Type

    jour

  • DOI
    10.1109/64.482954
  • Filename
    482954