DocumentCode
747121
Title
Scheduling high-grade steelmaking
Author
Dorn, Jürgen ; Shams, Reza
Author_Institution
Christian Doppler Lab. for Expert Syst., Vienna Univ. of Technol., Austria
Volume
11
Issue
1
fYear
1996
fDate
2/1/1996 12:00:00 AM
Firstpage
28
Lastpage
35
Abstract
This expert system for scheduling high-grade steel production cuts engineering planning time, allows for greater what-if experimentation, and improves quality control. The complexity of production-cycle scheduling problems had defeated earlier, purely conventional software approaches
Keywords
expert systems; production control; steel industry; steel manufacture; engineering planning time; high-grade steel production; high-grade steelmaking scheduling; production-cycle scheduling problems; quality control; Alloying; Capacity planning; Casting; Constraint theory; Control systems; Job shop scheduling; Production; Slabs; Steel; Strain control;
fLanguage
English
Journal_Title
IEEE Expert
Publisher
ieee
ISSN
0885-9000
Type
jour
DOI
10.1109/64.482954
Filename
482954
Link To Document