DocumentCode
781146
Title
New ATC requirements phasing in preparation for the C-17 GATM/NAV safety functions to meet civil requirements
Author
Miller, Bruce J.
Author_Institution
Boeing Company, Laguna Niguel, CA, USA
Volume
18
Issue
9
fYear
2003
Firstpage
31
Lastpage
37
Abstract
For the next 10 years new worldwide communication, navigation, and surveillance (CNS) requirements are being incrementally imposed upon commercial aircraft avionics, and upon the Air Traffic Control community, by the Aviation Administrations of most nations, including the FAA and the JAA. These requirements are the result of a decade of study by the United Nations´ International Civil Aviation Organization (ICAO) to improve aviation safety and efficiency. In 2001, the USAF mandated compliance to the CNS requirements for its military aircraft, which is called Navigation Safety/Global Air Traffic Management (NS/GATM) by the USAF. By complying with these requirements, the C-17 will maintain its ability to fly internationally without CNS restrictions, such as requiring special handling. The Phase I study reported herein is the first phase of a three-phase study effort that will result in the C-17 achieving NS/GATM compliance for a specific set of NS/CNS requirements.
Keywords
air traffic control; aircraft communication; aircraft navigation; avionics; surveillance; ATC requirements phasing; C-17 GATM/NAV safety functions; CNS requirements; NS/GATM compliance; aircraft avionics; aviation safety; civil requirements; communication, navigation, and surveillance; Aerospace electronics; Air traffic control; Aircraft navigation; Computer displays; Frequency; Hardware; Military aircraft; Radio control; Safety; Surveillance;
fLanguage
English
Journal_Title
Aerospace and Electronic Systems Magazine, IEEE
Publisher
ieee
ISSN
0885-8985
Type
jour
DOI
10.1109/MAES.2003.1232158
Filename
1232158
Link To Document