• DocumentCode
    781146
  • Title

    New ATC requirements phasing in preparation for the C-17 GATM/NAV safety functions to meet civil requirements

  • Author

    Miller, Bruce J.

  • Author_Institution
    Boeing Company, Laguna Niguel, CA, USA
  • Volume
    18
  • Issue
    9
  • fYear
    2003
  • Firstpage
    31
  • Lastpage
    37
  • Abstract
    For the next 10 years new worldwide communication, navigation, and surveillance (CNS) requirements are being incrementally imposed upon commercial aircraft avionics, and upon the Air Traffic Control community, by the Aviation Administrations of most nations, including the FAA and the JAA. These requirements are the result of a decade of study by the United Nations´ International Civil Aviation Organization (ICAO) to improve aviation safety and efficiency. In 2001, the USAF mandated compliance to the CNS requirements for its military aircraft, which is called Navigation Safety/Global Air Traffic Management (NS/GATM) by the USAF. By complying with these requirements, the C-17 will maintain its ability to fly internationally without CNS restrictions, such as requiring special handling. The Phase I study reported herein is the first phase of a three-phase study effort that will result in the C-17 achieving NS/GATM compliance for a specific set of NS/CNS requirements.
  • Keywords
    air traffic control; aircraft communication; aircraft navigation; avionics; surveillance; ATC requirements phasing; C-17 GATM/NAV safety functions; CNS requirements; NS/GATM compliance; aircraft avionics; aviation safety; civil requirements; communication, navigation, and surveillance; Aerospace electronics; Air traffic control; Aircraft navigation; Computer displays; Frequency; Hardware; Military aircraft; Radio control; Safety; Surveillance;
  • fLanguage
    English
  • Journal_Title
    Aerospace and Electronic Systems Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    0885-8985
  • Type

    jour

  • DOI
    10.1109/MAES.2003.1232158
  • Filename
    1232158