DocumentCode
791943
Title
New Personnel Interlock System and Procedures for the RPI Linac Lab
Author
Morse, D.S. ; Haken, J. ; Ryan, R.M.
Author_Institution
Rensselaer Polytechnic Institute Linac Lab Troy, New York
Volume
16
Issue
3
fYear
1969
fDate
6/1/1969 12:00:00 AM
Firstpage
584
Lastpage
585
Abstract
Experience indicates that periodic modification to personnel interlock system operating procedures (nuisance modifications) increase user awareness. A modular interlock system which permits easy modification of the forced inspection sequence has been designed and installed at the RPI Accelerator Laboratory. The system provides for forced area inspection within specified time periods. Audible signals alert workers when the inspection is in progress.
Keywords
Economic indicators; Fires; Inspection; Laboratories; Linear particle accelerator; Neutrons; Personnel; Plugs; Presses; Protection;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1969.4325306
Filename
4325306
Link To Document