• DocumentCode
    801551
  • Title

    Operation and Improvement of the Cornell 10 GeV Electron Synchrotron

  • Author

    Tigner, Maury

  • Author_Institution
    Cornell University Ithaca, New York
  • Volume
    18
  • Issue
    3
  • fYear
    1971
  • fDate
    6/1/1971 12:00:00 AM
  • Firstpage
    957
  • Lastpage
    959
  • Abstract
    Performance figures for the past year are presented. Several improvements in equipment and technique that have had a significant impact on our physics program are discussed. Among these are the installation of two external electron beam systems, chopping of the linac beam, adjustable beam bump shaping, improved shielding, remote controlled targets, new methods of beam sharing and new modulators for the RF system. A brief presentation of our future plans is made.
  • Keywords
    Control systems; Electron beams; Linear particle accelerator; Optical modulation; Particle beams; Particle scattering; Physics; Radio frequency; Shape control; Synchrotrons;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1971.4326243
  • Filename
    4326243