• DocumentCode
    811540
  • Title

    Permitting a large cogeneration project in California

  • Author

    Vardeman, R. Don

  • Author_Institution
    Sun Exploration & Prod. Co., Valencia, CA, USA
  • Volume
    24
  • Issue
    6
  • fYear
    1988
  • Firstpage
    1160
  • Lastpage
    1167
  • Abstract
    The author discusses the permitting process which must be followed and major engineering and environmental issues which must be addressed to obtain a permit to construct a large cogeneration plant in the State of California. The specific cogeneration facility discussed is the proposed Midway Sunset Cogeneration Project (MCSP). The environmental issues considered are biological resources and air quality. The engineering issues considered are transmission-line engineering, transmission-system evaluation, electrical engineering, power-plant efficiency, and structural/civil/geotechnical engineering
  • Keywords
    air pollution detection and control; cogeneration; power transmission lines; California; Midway Sunset Cogeneration Project; air quality; biological resources; civil engineering; electrical engineering; engineering issues; environmental issues; geotechnical engineering; permitting process; power-plant efficiency; structural engineering; transmission-line engineering; transmission-system evaluation; Cogeneration; Environmental economics; Heat recovery; Out of order; Petroleum; Power generation economics; Production; Sun; Turbines; Water heating;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/28.17492
  • Filename
    17492