DocumentCode
822953
Title
Improved Testability Provisions for Boiling Water Reactors
Author
McGrath, J.N.
Author_Institution
Philadelphia Electric Company Philadelphia, Pennsylvania
Volume
23
Issue
1
fYear
1976
Firstpage
782
Lastpage
784
Abstract
Safety Systems (Emergency Core Cooling and Reactor trip) circuits at Peach Bottom were provided with complete, overlapping zone, on-line testability. This was accomplished by adding to and greatly expanding the coverage of the manufacturer installed test plugs. The general philosophy is that with proper insertion of test plugs, full logic initiation can be tested including valve operation and pump starts. No jumpers or lifted leads are required and injection into the core is defeated during test. These provisions simplified the testing program for Technical Specification (Tech Spec) requirements and eased licensing considerations. Although applied to a BWR, the principles outlined are applicable to any system or plant using digital inputs.
Keywords
Circuit testing; Cooling; Inductors; Licenses; Logic testing; Manufacturing; Plugs; Safety; System testing; Valves;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1976.4328343
Filename
4328343
Link To Document