• DocumentCode
    850405
  • Title

    EPRI ߞManufacturers 500/550 kV cable research project cable A ߞEffect of increased conductor temperature

  • Author

    McIlveen, E.E. ; Waldron, R.C. ; Garrison, V.L.

  • Author_Institution
    The Okonite Company, Ramsey, New Jersey
  • Volume
    95
  • Issue
    1
  • fYear
    1976
  • Firstpage
    279
  • Lastpage
    286
  • Abstract
    The original ERC - Manufacturers, 500/550 kV Cable Research test schedule was successfully completed [1] in August 1972 and most of the basic data has been presented [2]. A follow-on program designed to search for end-points has run its course and it is now appropriate to describe the events and consider their significance in EHV system design. Cyclic thermal loading has been postulated as a cause of EHV Cable system problems. This paper relates specifically to test specimen A and its performance in a high thermal load study at the Waltz Mill test facility [3]. The end point was reached but the failure mode appeared to be one of mechanical origin and will require further tests.
  • Keywords
    Communication cables; Conductors; Insulation; Job shop scheduling; Life estimation; Milling machines; System testing; Temperature; Thermal loading; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/T-PAS.1976.32103
  • Filename
    1601705