The history and philosophy of supervisory control of TVA hydro plants
Author
Herndon, R.H. ; Hewit, Robert F.
Author_Institution
Tennessee Valley Authority, Knoxville, Tennessee
Volume
95
Issue
4
fYear
1976
fDate
7/1/1976 12:00:00 AM
Firstpage
1177
Lastpage
1181
Abstract
The first eight hydroelectric generating stations built by TVA were staffed with both electrical operators and hydraulic operators and operating costs were high. After successful operation of two single unit plants via supervisory control, it was decided for economic reasons that new plants would be either supervisory controlled or certain features would be provided so only electrical operators would be required. Also existing stations were to be converted to one of these types of control. As a result, TVA now has 4 plants which were converted to supervisory control, 8 plants built equipped for supervisory control, 2 plants built to require only electrical operators, and 13 plants which were modified to eliminate the need for hydraulic operators. After many years of successful operation of these control systems, design work has now begun, in the interest of system efficiency and economy, on system-wide supervisory control from five area dispatch control centers. Initially, four existing hydro plants and a new pumped-storage plant will be incorporated into this control system.
Keywords
Automatic control; Condition monitoring; Control systems; Costs; History; Power generation; Power generation economics; Power systems; Remote monitoring; Supervisory control;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/T-PAS.1976.32211
Filename
1601813
Link To Document