• DocumentCode
    853297
  • Title

    A reliability cost-benefit analysis for HVDC transmission expansion planning

  • Author

    Kuruganty, P.R.S. ; Woodford, D.A.

  • Author_Institution
    Manitoba Hydro, Winnipeg, Man., Canada
  • Volume
    3
  • Issue
    3
  • fYear
    1988
  • fDate
    7/1/1988 12:00:00 AM
  • Firstpage
    1241
  • Lastpage
    1248
  • Abstract
    A major portion of Manitoba Hydro´s generation is located in the north on the Nelson River. The lower Nelson River generation is brought into the load center in southern Manitoba through an HVDC transmission system consisting of two bipoles. The total potential generation on the lower Nelson River consists of five plant sites of 5680 MW, two of which have been developed and the third of which is being built. This will result in 3580 MW of generation and a total HVDC transmission capability of 3680 MW. With the development of the remaining sites an additional bipole will be required. The methodology used in arriving at the optimum size for this bipole, using a reliability cost-benefit analysis, is described. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The load model used in the study was based on system data for the period 1980-1984. The optimum bipole size is determined to be 2200 MW
  • Keywords
    DC transmission networks; economics; power system planning; reliability; 2200 MW; 3580 MW; 3680 MW; 5680 MW; Canada; HVDC transmission system; bipoles; development; forced outages; load model; power system planning; reliability cost-benefit analysis; Cost benefit analysis; HVDC transmission; Maintenance; Power supplies; Power system security; Rectifiers; Rivers; Statistical analysis; Thyristors; Valves;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.193909
  • Filename
    193909