DocumentCode
859153
Title
Zero downtime
Author
Eaton, Danny W. ; Rama, John C. ; Macak, Amy L.
Author_Institution
Marathon Pet. Co., Marathon, FL
Volume
14
Issue
6
fYear
2008
Firstpage
14
Lastpage
18
Abstract
The strategy to achieve the desired outcome of five-year operation without downtime was discussed. This article provides an update of the experience with the new systems, problems encountered, successes achieved, and lessons learned. The strategy to extend the reliable operation of the key electrical equipment will be discussed as well as the maintenance challenges to prepare the drive trains for the next long run following the current one.
Keywords
maintenance engineering; reliability; variable speed drives; electrical equipment reliabilty; maintenance engineering; variable speed drives; Circuit faults; Combustion; Compressors; Costs; Drives; FCC; Maintenance; Petroleum; Pulse width modulation; Refining;
fLanguage
English
Journal_Title
Industry Applications Magazine, IEEE
Publisher
ieee
ISSN
1077-2618
Type
jour
DOI
10.1109/MIAS.2008.929336
Filename
4623734
Link To Document