• DocumentCode
    859361
  • Title

    Los Alamos Proton Storage Ring Extraction System

  • Author

    Hudgings, Daniel W. ; Jason, Andrew J.

  • Author_Institution
    Los Alamos National Laboratory, Los Alamos, NM 87545
  • Volume
    28
  • Issue
    3
  • fYear
    1981
  • fDate
    6/1/1981 12:00:00 AM
  • Firstpage
    2791
  • Lastpage
    2793
  • Abstract
    The unprecedented peak and average proton currents and extraction rates from the Proton Storage Ring (PSR) under construction at the Los Alamos National Laboratory present new problems in beam extraction. Activation caused by beam spill must be minimal to permit hands-on maintenance. Timing requirements are uncommonly stringent. Solutions to these problems are outlined below.
  • Keywords
    Electrodes; Jitter; Laboratories; Neutrons; Particle beams; Protons; Storage rings; Structural beams; Timing; Transmission lines;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1981.4331914
  • Filename
    4331914