DocumentCode
867627
Title
Status Report on GANIL
Author
GANIL Group
Author_Institution
GANIL BP 5027 14021 CAEN Cedex (France) Tel. (31) 94 81 11 Telex 170533 F
Volume
30
Issue
4
fYear
1983
Firstpage
2102
Lastpage
2104
Abstract
The first beam (Ar+4) from SSC1 was obtained in June 82. A full energy Ar+16 beam at ~ 44 MeV/A was accelerated in SSC2 in November and delivered to physicists in January 83. Till now, nine experiments have been performed.
Keywords
Acceleration; Coils; Notice of Violation; Particle beams; Physics; Probes; Radio frequency; Stability; Tuning; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1983.4332729
Filename
4332729
Link To Document