DocumentCode
880620
Title
Progress Report on the NBS/LOS Alamos RTM
Author
Penner, S. ; Ayres, R.L. ; Cutler, R.I. ; Debenham, P.H. ; Lindstrom, E.R. ; Mohr, D.L. ; Rose, J.E. ; Unterweger, M.P. ; Wilson, M.A.D. ; Biddle, R. ; Martin, E.R. ; Stovall, J.E. ; Tallerico, P.J. ; Wilkerson, L. ; Young, L.M.
Author_Institution
National Bureau of Standards
Volume
32
Issue
5
fYear
1985
Firstpage
2669
Lastpage
2671
Abstract
The NBS-Los Alamos 200 MeV Racetrack Microtron (RTM) is being built under a program aimed at developing the technology needed for high-current intermediateenergy CW electron accelerators. In this report we give an overview of the present status of the project. Recent progress includes: (1) completion of testing of the 100 keV chopper-buncher system demonstrating a normalized emittance well under the design goal of 2.6 ¿ mm mrad at currents exceeding the design goal of 600 ¿A; (2) operation of the rf structures comprising the 5 MeV injector linac at power levels up to 50 kW/m, resulting in an accelerating gradient at Ã=1 of 2 MV/m (compared to a design goal of 1.5 MV/m). The measured shunt impedance is 82.5 Mn/m; (3) construction and installation of the 30 ton end magnets of the RTM. Field mapping of one magnet has been completed and its uniformity exceeds the design goal of ±2 parts in 104; (4) performance tests (with beam) of prototype rf beam monitors which measure current, relative phase, and beam position in both transverse planes. (5) Installation and initial operation of the primary control system.
Keywords
Electron accelerators; Impedance measurement; Life estimation; Linear particle accelerator; Magnetic field measurement; Magnets; NIST; Prototypes; Structural beams; System testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4334013
Filename
4334013
Link To Document