• DocumentCode
    902062
  • Title

    Advanced Rapid Attenuation Measurement System (ARAMS)

  • Author

    Yu, Y.B.

  • Author_Institution
    Autonetics Strategic Systems Division Rockwell International Corporation 3370 Miraloma Avenue Anaheim, CA 92803
  • Volume
    29
  • Issue
    6
  • fYear
    1982
  • Firstpage
    1930
  • Lastpage
    1934
  • Abstract
    An advanced cable shielding acceptance test system, Advanced Rapid Measurement System (ARAMS), for production end items is proposed, evaluated, and analyzed. In this method, the requirement of shielding against external electromagnetic fields is translated into transfer impedance requirements for cable overbraids and connectors within a cable set. These transfer impedance requirements are shown to be met by conducting tests using the ARAMS.
  • Keywords
    Attenuation measurement; Cable shielding; Circuit testing; Connectors; Current measurement; Electromagnetic fields; Impedance; Integrated circuit interconnections; Power cables; System testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1982.4336473
  • Filename
    4336473