• DocumentCode
    915639
  • Title

    Partial discharge testing of gas insulated substations

  • Volume
    7
  • Issue
    2
  • fYear
    1992
  • fDate
    4/1/1992 12:00:00 AM
  • Firstpage
    499
  • Lastpage
    506
  • Abstract
    A discussion of partial discharge (PD) testing of SF6 gas insulated substations (GISs) is based on a consensus among the experts on and associated with WG K4 of the IEEE Substations Committee. Such testing is discussed in the context of type testing, factory routine testing, testing of solid dielectric spacers, and field PD testing. The latter tends to be the most problematic and hence receives the most detailed discussion
  • Keywords
    gaseous insulation; partial discharges; substations; sulphur compounds; testing; SF6 gas insulated substations; factory routine testing; field partial discharge testing; partial discharge testing; solid dielectric spacers; type testing; Assembly; Costs; Dielectrics; Gas insulation; Geographic Information Systems; Interference; Partial discharges; Production facilities; Substations; Testing;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.127042
  • Filename
    127042