Title of article :
Eects of welding operating factor on shipyard panel lines production quantity
Author/Authors :
Ozkok، M. نويسنده Ph.D. degrees ,
Issue Information :
دوماهنامه با شماره پیاپی 26 سال 2013
Pages :
8
From page :
1773
To page :
1780
Abstract :
Welding processes play a major role in ship production. If the welding process can be performed in less time, ship fabrication can be completed in a shorter time. Therefore, it is a signi cant issue for welding time to be ended as soon as possible. For this, the operator factor, which is a component of welding time calculation, could be increased. If this is done, welding time could be decreased. The purpose of this study is to determine the e ects of operator factor on the production quantity of a panel line. Here, the panel line of a shipyard situated in Turkey was illustrated as an example. Whole workstations of a panel line were taken into consideration and modeled in a SIMIO simulation environment. By changing the operator factor in a web welding work station on a panel line, di erent welding time values were achieved. These welding time values were then inserted into a simulation model and the model was run for a speci ed period. Finally, the production quantities of the panel line were obtained as an output. Thus, the e ects of a changing operator factor on panel line throughput were determined.
Journal title :
Scientia Iranica(Transactions B:Mechanical Engineering)
Serial Year :
2013
Journal title :
Scientia Iranica(Transactions B:Mechanical Engineering)
Record number :
1015523
Link To Document :
بازگشت