Title of article
Consideration of transportation lags in a two-machine Flow shop scheduling problem
Author/Authors
Jolai، F. نويسنده Professor of Industrial Engineering at the College of Engineering, , , Abedinnia، H. نويسنده He obtained both his Master and Bachelor degrees in Industrial Engineering at College of Engineering, University of Tehran, Iran ,
Issue Information
دوماهنامه با شماره پیاپی E2 سال 2013
Pages
9
From page
2215
To page
2223
Abstract
This paper considers two-machine
ow shop scheduling problem while there is
ineligible transportation lags in production procedure. There is one transporter to convey
semi-nished jobs between machines, and another transporter to deliver nished jobs to the
warehouse (customers). The problem is formulated as a Mixed Integer Linear Programming
(MILP) model to minimize the makespan as an objective function. To solve the problem in
an ecient way, two heuristic algorithms are also developed. Furthermore, ve lower bounds
are proposed and computational experiments are carried out to verify the eectiveness of
the proposed lower bounds and heuristic algorithms. The results show the performance of
the heuristics to deal with medium and large size problems.
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Serial Year
2013
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Record number
1025540
Link To Document