• Title of article

    Consideration of transportation lags in a two-machine Flow shop scheduling problem

  • Author/Authors

    Jolai، F. نويسنده Professor of Industrial Engineering at the College of Engineering, , , Abedinnia، H. نويسنده He obtained both his Master and Bachelor degrees in Industrial Engineering at College of Engineering, University of Tehran, Iran ,

  • Issue Information
    دوماهنامه با شماره پیاپی E2 سال 2013
  • Pages
    9
  • From page
    2215
  • To page
    2223
  • Abstract
    This paper considers two-machine ow shop scheduling problem while there is ineligible transportation lags in production procedure. There is one transporter to convey semi- nished jobs between machines, and another transporter to deliver nished jobs to the warehouse (customers). The problem is formulated as a Mixed Integer Linear Programming (MILP) model to minimize the makespan as an objective function. To solve the problem in an ecient way, two heuristic algorithms are also developed. Furthermore, ve lower bounds are proposed and computational experiments are carried out to verify the e ectiveness of the proposed lower bounds and heuristic algorithms. The results show the performance of the heuristics to deal with medium and large size problems.
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Serial Year
    2013
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Record number

    1025540