Title of article :
Development of a Set of Algorithms for the Multi-Project Scheduling Problems
Author/Authors :
Tari، Farhad Ghassemi نويسنده Department of Industrial Engineering Tari, Farhad Ghassemi , Olfat، Laya نويسنده ,
Issue Information :
فصلنامه با شماره پیاپی سال 2007
Pages :
14
From page :
23
To page :
36
Abstract :
In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due date associated with the completion of each operation on each machine. Four algorithms based on the concept of “apparent tardiness cost” (ATC) are developed for solving the GTF problem. The relative effectiveness of the developed algorithms will then be evaluated through an extensive computational experiment.
Journal title :
Journal of Industrial and Systems Engineering (JISE)
Serial Year :
2007
Journal title :
Journal of Industrial and Systems Engineering (JISE)
Record number :
1092320
Link To Document :
بازگشت