Title of article
Views on Libyan national plan (LNP) to resolve water shortage problem (WSP). Part Ib: Great Man-Made River (GMMR) project — capital cost with interest rates Original Research Article
Author/Authors
Abdulmonem Elhassadi، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
5
From page
184
To page
188
Abstract
Libyan national plan (LNP) to resolve the water shortage problem will be illustrated through a quartet of a series of papers. The first series of papers (I) will deal with Great Man-Made River (GMMR) supplied from rich ground water reservoirs located in the southern desert regions. This paper (Ib) will conduct the cost analysis study by considering the influence of interest rates on capital costs, as compared to the first paper (Ia) which neglected the effect of interest rates and treated capital costs as sunk value. This will improve the ability to analyze the viability and feasibility of this mean in comparison with other means to resolve the water shortage problem.
Keywords
LNP , WSP , GMMR , Cost analysis , Feasibility studies , Sunk value , Interest rates
Journal title
Desalination
Serial Year
2008
Journal title
Desalination
Record number
1111250
Link To Document