• Title of article

    Multi-Objective Trade-Offs between Cost and Reliability in the Replacement of Water Mains

  • Author/Authors

    Dandy، G. C. نويسنده , , Engelhardt، M. O. نويسنده ,

  • Issue Information
    دوفصلنامه با شماره پیاپی سال 2006
  • Pages
    -78
  • From page
    79
  • To page
    0
  • Abstract
    Two of the main performance criteria of a water distribution system are that it is inexpensive to construct, operate, and maintain and that it operates in a reliable manner. These two criteria are often conflicting, thus implying that the decision maker needs to reach a compromise in scheduling mains for replacement. One way to facilitate this decision is to generate a trade-off surface that represents the compromise between the two objectives. This paper demonstrates the use of genetic algorithms to generate trade-off curves between cost and reliability for pipe replacement decisions. Curves for two planning scenarios are generated. The first identifies the trade-offs necessary for the current conditions. The second allows the water authority to determine the required levels of future expenditure, given funding constraints, to meet a specified level of service over the entire planning horizon. Alternatively, it provides an estimate of the impact on performance of delaying expenditure.
  • Keywords
    Ultrafiltration , Proteolysis , chymosin reduction , salt reduction , white cheese
  • Journal title
    Journal of Water Resources Planning and Management
  • Serial Year
    2006
  • Journal title
    Journal of Water Resources Planning and Management
  • Record number

    114179