• Title of article

    A multicriteria flowshop scheduling problem with setup times

  • Author/Authors

    Tamer Eren and Ertan Güner، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2007
  • Pages
    6
  • From page
    60
  • To page
    65
  • Abstract
    Most of research in production scheduling is concerned with the minimization of a single criterion. However, scheduling problems often involve more than one aspect and therefore require multicriteria analysis. In this study, a multicriteria two-machine flowshop scheduling problem with setup times is considered. The objective function of the problem is minimization of the weighted sum of total completion time, makespan, maximum tardiness and maximum earliness. An integer programming model is developed for the problem which belongs to NP-hard class. Only small size problems with up to 20 jobs can be solved by the proposed integer programming model. Heuristic methods are also used to solve large size problems. These heuristics are six tabu search based heuristics and random search method. According to computational results, the tabu search based methods are effective in finding problem solutions with up to 1000 jobs.
  • Keywords
    Multicriteria , Integer programming , Heuristic methods , Flowshop scheduling , Setup times
  • Journal title
    Journal of Materials Processing Technology
  • Serial Year
    2007
  • Journal title
    Journal of Materials Processing Technology
  • Record number

    1180789