• Title of article

    Risk-informed optimisation of railway tracks inspection and maintenance procedures

  • Author/Authors

    Luca Podofillini، نويسنده , , Enrico Zio، نويسنده , , J?rn Vatn، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2006
  • Pages
    16
  • From page
    20
  • To page
    35
  • Abstract
    Nowadays, efforts are being made by the railway industry for the application of reliability-based and risk-informed approaches to maintenance optimisation of railway infrastructures, with the aim of reducing the operation and maintenance expenditures while still assuring high safety standards. In particular, in this paper, we address the use of ultrasonic inspection cars and develop a methodology for the determination of an optimal strategy for their use. A model is developed to calculate the risks and costs associated with an inspection strategy, giving credit to the realistic issues of the rail failure process and including the actual inspection and maintenance procedures followed by the railway company. A multi-objective optimisation viewpoint is adopted in an effort to optimise inspection and maintenance procedures with respect to both economical and safety-related aspects. More precisely, the objective functions here considered are such to drive the search towards solutions characterized by low expenditures and low derailment probability. The optimisation is performed by means of a genetic algorithm. The work has been carried out within a study of the Norwegian National Rail Administration (Jernbaneverket).
  • Journal title
    Reliability Engineering and System Safety
  • Serial Year
    2006
  • Journal title
    Reliability Engineering and System Safety
  • Record number

    1187404