• Title of article

    A multi-component and multi-failure mode inspection model based on the delay time concept

  • Author/Authors

    Wenbin Wang، نويسنده , , Dragan Banjevic، نويسنده , , Michael Pecht، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    9
  • From page
    912
  • To page
    920
  • Abstract
    The delay time concept and the techniques developed for modelling and optimising plant inspection practices have been reported in many papers and case studies. For a system comprised of many components and subject to many different failure modes, one of the most convenient ways to model the inspection and failure processes is to use a stochastic point process for defect arrivals and a common delay time distribution for the duration between defect the arrival and failure of all defects. This is an approximation, but has been proven to be valid when the number of components is large. However, for a system with just a few key components and subject to few major failure modes, the approximation may be poor. In this paper, a model is developed to address this situation, where each component and failure mode is modelled individually and then pooled together to form the system inspection model. Since inspections are usually scheduled for the whole system rather than individual components, we then formulate the inspection model when the time to the next inspection from the point of a component failure renewal is random. This imposes some complication to the model, and an asymptotic solution was found. Simulation algorithms have also been proposed as a comparison to the analytical results. A numerical example is presented to demonstrate the model.
  • Keywords
    Maintenance , Optimal inspection interval , Inspection , Delay time
  • Journal title
    Reliability Engineering and System Safety
  • Serial Year
    2010
  • Journal title
    Reliability Engineering and System Safety
  • Record number

    1188193