Title of article :
Assessing maintenance contracts when preventive maintenance is outsourced
Author/Authors :
Shaomin Wu، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
7
From page :
66
To page :
72
Abstract :
In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.
Keywords :
Corrective maintenance (CM) , Minimal repair , Preventive maintenance (PM) , Maintenance outsourcing , Bonus function
Journal title :
Reliability Engineering and System Safety
Serial Year :
2012
Journal title :
Reliability Engineering and System Safety
Record number :
1188409
Link To Document :
بازگشت