Abstract :
In this study, mathematical models are developed to study and compare the operations of a fully reliable and an unreliable flexible manufacturing cell (FMC), each with a flexible machine, a loading/unloading robot, and a pallet handling system. The operation times, loading/unloading times, and material handling times by the pallet are assumed to be random. The operation of the reliable cell is compared to that of an unreliable cell with respect to utilization of the cell components, including the machine, robot, and pallet handling system. The unreliable cell is assumed to operate under random (machine and robot) failures with constant failure rates for the machine and the robot. The pallet handling system is assumed to be completely reliable.