Title of article :
Practical crack control during the construction of precast segmental box girder bridges
Author/Authors :
Do-Young Moon، نويسنده , , Jongsung Sim ، نويسنده , , Hongseob Oh، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2005
Pages :
10
From page :
2584
To page :
2593
Abstract :
Cracks that occurred in the bottom slab of a precast segmental bridge were investigated through a construction sequence analysis, which revealed that the cracks were caused by excessive deformation during temporary post-tensioning while joining the segments. In addition, a parametric study was performed to evaluate the effects of the prestressing sequence, bottom slab thickness, and position of the prestressing anchors. The structural behavior of the girder sections was greatly affected by the thickness of the bottom slab and the position of prestressing anchors, but not by the prestressing sequence. Based on the results, a construction method that prevents the cracks is proposed.
Keywords :
FE analysis , PC box girder , Temporary prestressing , Precast segmental bridge , Structural behavior , Construction sequence analysis
Journal title :
Computers and Structures
Serial Year :
2005
Journal title :
Computers and Structures
Record number :
1209861
Link To Document :
بازگشت