Title of article :
Multiobjective constructive heuristics for the 1/3 variant of the time and space assembly line balancing problem: ACO and random greedy search
Author/Authors :
Manuel Chica، نويسنده , , ?scar Cord?n، نويسنده , , Sergio Damas، نويسنده , , Joaqu?n Bautista، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Abstract :
In this work we present two new multiobjective proposals based on ant colony optimisation and random greedy search algorithms to solve a more realistic extension of a classical industrial problem: time and space assembly line balancing. Some variants of these algorithms have been compared in order to find out the impact of different design configurations and the use of heuristic information. Good performance is shown after applying every algorithm to 10 well-known problem instances in comparison to NSGA-II. In addition, those algorithms which have provided the best results have been employed to tackle a real-world problem at the Nissan plant, located in Spain.
Keywords :
Ant colony optimisation , Multiobjective optimisation , GRASP , NSGA-II , Time and space assembly line balancing problem , automotive industry
Journal title :
Information Sciences
Journal title :
Information Sciences