Title of article :
General flowshop scheduling problem with the sequence dependent setup times: A heuristic approach
Author/Authors :
Seyed Amir Mohsen Ziaee، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Pages :
10
From page :
126
To page :
135
Abstract :
This paper proposes a new heuristic method for the general flowshop scheduling problem with the due dates and the sequence dependent setup times (SDSTs) where the objective is to minimize the total weighted tardiness. The approach consists of two phases: in the first phase, a permutation sequence is obtained and this sequence is then improved by a non-permutation local search in the next phase. Using some well-known standard benchmark problems, we examine the performance of the proposed algorithm and our computational results indicate that, despite its simplicity, the proposed heuristic approach provides better solutions than some other alternative methods.
Keywords :
sequence dependent setup times , Total weighted tardiness , General flowshop scheduling problem , Scheduling , heuristic
Journal title :
Information Sciences
Serial Year :
2013
Journal title :
Information Sciences
Record number :
1215837
Link To Document :
بازگشت