Integrated procurement planning for supplying energy plant with forest, fossil, and wood-waste fuels
Author/Authors
Teijo Palander، نويسنده , , Lauri Vesa، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
8
From page
409
To page
416
Abstract
In this paper, a potential solution to large-scale and long-term industrial fuel procurement scheduling problems is considered. The problems include the allocation of a number of fossil, peat, and wood-waste fuel procurement chains to an energy plant during different periods. This decision environment is further complicated by sequence-dependent procurement chains for forest fuels. A dynamic linear programming model was used to describe the scheduling task. This approach can be efficiently used for modelling material flows in procurement planning. However, due to the complex nature of the problem, the resulting model cannot be directly used to solve the integrated planning problem in a manner that is relevant to the forest industry. Therefore, this approach was combined with an energy-flow model to better describe the combinatorial complexity. The properties of this methodology are discussed and two examples of how the model works based on real-world data and an optional emissions cost constraint are presented.
Journal title
Biosystems Engineering
Serial Year
2009
Journal title
Biosystems Engineering
Record number
1267372
Link To Document