Title of article :
A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
Author/Authors :
Linhui Sun *، نويسنده , , Linyan Sun، نويسنده , , Kai Cui، نويسنده , , Ji-Bo Wang، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Abstract :
The main results in a recent paper [M. Cheng, S. Sun, L. He, Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines, European Journal of Operational Research 183 (2007) 115–124] are incorrect because job processing times are variable due to deteriorating effect, which is not taken into account by the authors. In this note, we show first by counter-examples that the published results are incorrect, and then we provide corrected results.
Keywords :
Deteriorating jobs , Dominant machines , Flow shop , Scheduling
Journal title :
European Journal of Operational Research
Journal title :
European Journal of Operational Research