Title of article :
Cut generation for an integrated employee timetabling and production scheduling problem
Author/Authors :
O. Guyon، نويسنده , , P. Lemaire، نويسنده , , E. Pinson، نويسنده , , D. Rivreau، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
11
From page :
557
To page :
567
Abstract :
This paper investigates the integration of the employee timetabling and production scheduling problems. At the first level, we manage a classical employee timetabling problem. At the second level, we aim at supplying a feasible production schedule for a set of interruptible tasks with qualification requirements and time-windows. Instead of hierarchically solving these two problems as in the current practice, we try here to integrate them and propose two exact methods to solve the resulting problem. The former is based on a Benders decomposition while the latter relies on a specific decomposition and a cut generation process. The relevance of these different approaches is discussed here through experimental results.
Keywords :
Cut generation , Production scheduling problem , Energetic reasoning , Benders decomposition , Employee timetabling problem
Journal title :
European Journal of Operational Research
Serial Year :
2010
Journal title :
European Journal of Operational Research
Record number :
1312446
Link To Document :
بازگشت