Title of article
A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”
Author/Authors
Yuan-Shyi Peter Chiu، نويسنده , , Chia-Kuan Ting، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
3
From page
641
To page
643
Abstract
In a recently published paper by Chiu et al. [Chiu, S.W., Wang, S.-L., Chiu, Y.-S.P., 2007. Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns. European Journal of Operational Research 180, 664–676], a theorem on conditional convexity of the integrated total cost function was employed in their solution procedure. We reexamine this theorem and present a direct proof to the convexity of the total cost function. This proof can be used in place of Theorem 1 of Chiu et al.’s paper to enhance quality of their optimization process.
Keywords
Manufacturing , Machine breakdown , Defective item , Rework , Production
Journal title
European Journal of Operational Research
Serial Year
2010
Journal title
European Journal of Operational Research
Record number
1312463
Link To Document