Title of article
Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
Author/Authors
Joaqu?n Bautista، نويسنده , , Alberto Cano، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
19
From page
495
To page
513
Abstract
In this manuscript, we present a formulation for the MMSP-W (Mixed model sequencing problem with workload minimisation) for production lines with serial workstations. We demonstrate the validity of the basic models in the presence of a control system on the production line that allows the stopping of operations with no restrictions. We propose an extension of the basic models that allows conditioned interruption of operations to facilitate line management. We then propose a procedure to solve the proposed problem through BDP (Bounded Dynamic Programming), and demonstrate its validity through a computational experiment with reference instances and a case study linked to the Nissan powertrain plant in Barcelona.
Keywords
Dynamic programming , Linear programming , Scheduling , Sequencing , Work overload
Journal title
European Journal of Operational Research
Serial Year
2011
Journal title
European Journal of Operational Research
Record number
1313134
Link To Document