Title of article :
Scheduling of corrugated paper production
Author/Authors :
Kazuki Matsumoto، نويسنده , , Hiroyoshi Miwa، نويسنده , , Toshihide Ibaraki، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Abstract :
Corrugated paper is produced by gluing three types of papers of the same breadth. Given a set of orders, we first assign each order to one of the standard breadths, and then sequence those assigned to each standard breadth so that they are continuously manufactured from the three rolls of the specified standard breadth equipped in the machine called corrugator. Here we are asked to achieve multi-goals of minimizing total length of roll papers, total loss of papers caused by the differences between standard breadths and real breadths of the orders, and the number of machine stops needed during production. We use integer programming to assign orders to standard breadths, and then develop a special purpose algorithm to sequence the orders assigned to each standard breadth. This is a first attempt to handle scheduling problems of the corrugator machine.
Keywords :
Corrugated paper , Complexity , Scheduling , Integer programming , Contiguous set
Journal title :
European Journal of Operational Research
Journal title :
European Journal of Operational Research