• Title of article

    Solution approaches for the soft drink integrated production lot sizing and scheduling problem

  • Author/Authors

    Deisemara Ferreira، نويسنده , , Reinaldo Morabito، نويسنده , , Socorro Rangel c، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2009
  • Pages
    10
  • From page
    697
  • To page
    706
  • Abstract
    In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.
  • Keywords
    Relax-and-fix heuristic , Lot sizing , Scheduling , Soft drink industry , Mixed integer programming
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2009
  • Journal title
    European Journal of Operational Research
  • Record number

    1313691