Title of article
Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval
Author/Authors
Hans Kellerer، نويسنده , , Mikhail A. Kubzin، نويسنده , , Vitaly A. Strusevich، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
6
From page
111
To page
116
Abstract
In this note, we consider the scheduling problem of minimizing the sum of the weighted completion times on a single machine with one non-availability interval on the machine under the non-resumable scenario. Together with a recent 2-approximation algorithm designed by Kacem [I. Kacem, Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval, Computers & Industrial Engineering 54 (2008) 401–410], this paper is the first successful attempt to develop a constant ratio approximation algorithm for this problem. We present two approaches to designing such an algorithm. Our best algorithm guarantees a worst-case performance ratio of 2+ε
Keywords
Single machine scheduling , Machine non-availability , Total weighted completion time , Approximation algorithm
Journal title
European Journal of Operational Research
Serial Year
2009
Journal title
European Journal of Operational Research
Record number
1313979
Link To Document