• Title of article

    Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time

  • Author/Authors

    T.C.E. Cheng، نويسنده , , C.T. Ng، نويسنده , , J.J. Yuan، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    12
  • From page
    320
  • To page
    331
  • Abstract
    Recently Koulamas and Kyparisis [Koulamas, C., Kyparisis, G.J., in press. Single-machine scheduling with past-sequence-dependent setup times. European Journal of Operational Research] introduced past-sequence-dependent setup times to scheduling problems. This means that the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. Koulamas and Kyparisis [Koulamas, C., Kyparisis, G.J., in press. Single-machine scheduling with past-sequence-dependent setup times. European Journal of Operational Research] were able to show for a number of single-machine scheduling problems with completion time goals that they remain polynomially solvable. In this paper we extend the analysis to problems with due dates. We demonstrated that some problems remain polynomially solvable. However, for some other problems well-known polynomially solution approaches do not guarantee optimality any longer. Consequently we concentrated on finding polynomially solvable special cases.
  • Keywords
    Scheduling , Setup times , Due dates
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2008
  • Journal title
    European Journal of Operational Research
  • Record number

    1314070