• Title of article

    Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

  • Author/Authors

    Ruud Teunter، نويسنده , , Konstantinos Kaparis، نويسنده , , Ou Tang، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    13
  • From page
    1241
  • To page
    1253
  • Abstract
    We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.
  • Keywords
    Returns , Remanufacturing , Reverse logistics , ELSP
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2008
  • Journal title
    European Journal of Operational Research
  • Record number

    1314137