• Title of article

    Integrating barcode and GIS for monitoring construction progress

  • Author/Authors

    Cheng، نويسنده , , Min-Yuan and Chen، نويسنده , , Jiann-Chyun، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    11
  • From page
    23
  • To page
    33
  • Abstract
    This study focuses on developing an automated schedule monitoring system for precast building construction. Erection of prefabricated structural components is the major critical activity for precast building construction. An efficient lifting schedule and control plan can significantly reduce construction conflicts and project delay. In this research, the system ArcSched was developed to assist engineers in controlling and monitoring the erection process in a real time basis. ArcSched is composed of a Geographic Information System (GIS) integrated with a database management system. Through systematic monitoring of the construction process and representation of the erection progress in graphics and colors, the scheduled components for erection are repetitively tracked and well controlled to implement the lifting schedule as planned.
  • Keywords
    GIS , ArcSched , Construction progress
  • Journal title
    Automation in Construction
  • Serial Year
    2002
  • Journal title
    Automation in Construction
  • Record number

    1337133