Title of article
GA-based resource-constrained flow-shop scheduling model for mixed precast production
Author/Authors
Leu، نويسنده , , Sou-Sen and Hwang، نويسنده , , Shao-Ting، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2002
Pages
14
From page
439
To page
452
Abstract
Precast production tasks mainly consist of reinforcement cage prefabrication, form fabrication, installment of reinforcement cages, mosaic or tiling fitting, placing concrete, steam curing, cleaning and finishing operations. These tasks are generally arranged as a flow shop process, in which all the precast elements are processed in the same processing order through all the tasks. The precast production needs to take into account the impact of limited resources, including equipment and skilled labor, on production makespan. Moreover, to economically and effectively utilize these valuable resources, mixed production gains a potential advantage over the conventional separate production under resource constraints. A resource-constrained mixed-production flow-shop scheduling system is proposed in this paper. A genetic algorithm-based searching technique is adopted in the system to provide the optimal or near-optimal combination of production sequences, resource utilization, and minimum makespan in consideration of resource constraints and mixed production. Sensitivity analysis is further conducted to identify the impact of mixed production strategies on the overall precast production makespan.
Keywords
Flow-shop , Precast production , genetic algorithm
Journal title
Automation in Construction
Serial Year
2002
Journal title
Automation in Construction
Record number
1337194
Link To Document