Action-based union of the temporal opposites in scheduling: non-deterministic approach
Author/Authors
Yagi، نويسنده , , Junichi and Arai، نويسنده , , Eiji and Shirase، نويسنده , , Keiichi and Matsumoto، نويسنده , , Shinji، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2003
Pages
9
From page
321
To page
329
Abstract
It is the time resource that one deals with in scheduling. The task is how one can achieve the optimal allocation of a given time resource over a set of assigned activities. Most of the existing scheduling methods use a parametric time by which the activities are orderly allocated in accordance with the order of events. The parametric methods, however, fail in incorporating a dynamic aspect of scheduling that unfolds itself as the project proceeds, and also uncertainty that the starting and ending nodes of an activity fluctuate. This paper reformulates the concept of time to match to a dynamic scheduling through a non-deterministic approach. In particular, time can be regarded as an object in the holographic space, which models the dynamic aspects of time as a “mapped/represented” and “transformed/processed” temporal movement.
Keywords
Certainty and uncertainty , Union of opposites , Internal and external order of time , entropy , Initial and final conditions , Dichotomy , Temporal symmetry and asymmetry