Title of article
Automatic schedule integration for highway projects
Author/Authors
Dzeng، نويسنده , , Ren-Jye and Wang، نويسنده , , Wei-Chih، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2003
Pages
15
From page
447
To page
461
Abstract
The construction of a highway/expressway, which involves a complex combination of roads, bridges, and tunnels, is generally separated into several projects. Various contractors thus execute different projects and often apply differing scheduling practices. Since all projects involved in highway construction must be completed for the highway to be useful, the management of the various projects should preferably be integrated. To assist project controllers in schedule integration, this study proposes algorithms based on standardized codes and network modules. A computer system was also designed to help contractors use these modules for scheduling, and ultimately to let project controllers combine these schedules electronically. A questionnaire survey and industry feedback revealed the potential benefits of using the proposed algorithms for generating and integrating schedules, respectively. Contractorsʹ computation capabilities must be improved before the proposed scheduling algorithms can be fully implemented.
Keywords
Schedule integration , Modularization , Infrastructure management , Construction scheduling , Standardization
Journal title
Automation in Construction
Serial Year
2003
Journal title
Automation in Construction
Record number
1337320
Link To Document