• Title of article

    System development for non-unit based repetitive project scheduling

  • Author/Authors

    Huang، نويسنده , , Rong-yau and Sun، نويسنده , , Kuo-Shun، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2005
  • Pages
    16
  • From page
    650
  • To page
    665
  • Abstract
    Repetitive activities are commonly found in construction projects. It is stated in many literatures that repetitive scheduling methods are more effective than traditional CPM methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit based algorithm and a prototype system are developed for the planning and scheduling of repetitive projects. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The developed system takes into consideration (1) the logical relationship of activity groups in a repetitive project, (2) the usage of various resource crews in an activity group, (3) the maintaining of resource continuity, and (4) the time and cost for the routing of resource crews. A sample case study is conducted for system validation, as well as for demonstration. Application of repetitive scheduling methods can be facilitated with the developed system.
  • Keywords
    construction , Scheduling , Repetitive , Resource , Object-Oriented
  • Journal title
    Automation in Construction
  • Serial Year
    2005
  • Journal title
    Automation in Construction
  • Record number

    1337625