Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
Author/Authors :
Rogalska، نويسنده , , Magdalena and Bo?ejko، نويسنده , , Wojciech and Hejducki، نويسنده , , Zdzis?aw، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2008
Pages :
8
From page :
24
To page :
31
Abstract :
This paper deals with construction project scheduling. In the literature on the subject one can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance (LOB) charts and CMP/PERT network planning. The methods take into account several objective functions: the least cost, the least time, limited resources, work priorities, etc., both in the deterministic and probabilistic approach. The paper presents an analysis of the time/cost relationship, performed using time coupling method TCM III. A modified hybrid evolutionary algorithm (HEA) developed by Bożejko and Wodecki (A Hybrid Evolutionary Algorithm for Some Discrete Optimization Problems. IEEE Computer Society, 325–331, 2005) was used for optimization.
Keywords :
Hybrid evolutionary algorithm (HEA) , Time coupling methods (TCM) , Time/cost relationship