Title of article :
Application of computer simulation to bridge deck construction: Case study
Author/Authors :
Said، نويسنده , , H. and Marzouk، نويسنده , , M. and El-Said، نويسنده , , M.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
9
From page :
377
To page :
385
Abstract :
Bridge deck construction is performed in a cyclic manner and it involves different types of interacted resources. This paper presents a case study that discusses how computer simulation is used to aid bridgesʹ contractors in planning of bridgesʹ decks, taking into consideration the interaction amongst involved resources. As such, total duration of deck execution and the associated total costs, including direct and indirect costs, can be estimated. El-Warrak Bridge, which is a part of the Ring Road of Cairo, Egypt, is analyzed in a step-by-step procedure to demonstrate the capability of computer simulation in modeling construction of bridgesʹ decks using cast-in-place on falsework and cantilever carriage construction methods. The presented methodology proves its practicality to contractors in estimating the time and costs of the repetitive process of bridge deck construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities.
Keywords :
Cast-in-place on falsework construction , Cantilever carriage construction , Computer simulation , CASE STUDY
Journal title :
Automation in Construction
Serial Year :
2009
Journal title :
Automation in Construction
Record number :
1338018
Link To Document :
بازگشت