Optimizing construction planning schedules by virtual prototyping enabled resource analysis
Author/Authors :
Li، نويسنده , , Heng Huat Chan ، نويسنده , , Neo and Huang، نويسنده , , Ting Wei Guo، نويسنده , , H.L. and Lu، نويسنده , , Weisheng and Skitmore، نويسنده , , Martin، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
7
From page :
912
To page :
918
Abstract :
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. aper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
Keywords :
virtual prototyping , Resource analysis , Construction planning schedule , Space